General Contracting
Construction Management |
1316 Motor Parkway, Islandia, NY 11749 |
Tel: 631.254.6767 • Fax: 631.254.8015 |
|
45 Rockefeller Plaza, Ste. 2000 |
New York, NY 10111 |
Tel: 212.574.8101 • Fax: 631.254.8015 |
|
|
Ultra Diamonds Store
1770 West Main Street, Riverhead, NY |
Client: |
Ultra Diamond Stores |
Architect: |
Design Forum, Inc. |
Size: |
1,500 s.f. |
Cost: |
$105,000 |
|
|
Stalco performed an interior fit-out of the Ultra Diamonds store at the Tanger I Factory Outlets in Riverhead, NY. The firm completed this super fast track project in seven days, three days ahead of the client’s already very challenging 10-day schedule. The team achieved such short completion through very detailed planning, pre-purchasing of materials and equipment, and extensive overtime work. |
|
The interior finishes include high-end, custom designed wall coverings, carpet and simulated wood vinyl flooring, acoustical grid ceilings with reveal edge tiles, and more than 200 high-hat lighting fixtures. Stalco installed an outside signage and visual displays throughout the main sales floor. Stalco also built the jewelry chain’s store in Manhattan. |
|
|
|
|
|